Back to Journal
    Innovation·December 5, 2025

    Lakewood Village: Behind the Scenes

    By Xact Construction Team

    When we tell people that Lakewood Village — a 3-story, 4-building residential complex — was erected by just 11 workers in under 8 weeks, the first reaction is always skepticism. The second is curiosity. The third is excitement.

    RENCO MCFR composite blocks are engineered to interlock with precision and are assembled with the system's specified methyl methacrylate adhesive. The components arrive organized around project plans, creating a building-scale assembly process designed to reduce on-site labor.

    But speed isn't the only story. RENCO reports extensive structural, fire, moisture, and pest testing for its mineral composite system. Project performance still depends on the complete engineered assembly and the conditions in the applicable evaluation report.

    Lakewood Village isn't just a proof of concept — it's a proof of future. This is how we'll be building luxury developments five years from now. The question isn't whether this technology will become standard. It's how soon.

    Ready to Start Your Story?

    Every great project begins with a conversation.

    Call (561) 677-3847 Free Consultation